Sunday, 12 June 2011
Basketball court
Day view. Started from morning until around 4 p.m the room get enough sunlight to lightened the court.
The night view from both side. I try to minimalize the usage of artificial lights in this room, because a sport center usually use a lot of energy for lighting.
The night view from both side. I try to minimalize the usage of artificial lights in this room, because a sport center usually use a lot of energy for lighting.
Final Render
I try to make rendered pic of each rooms inside to visualize the lighting, from sunlight and artificial light. Every room show the effecctiveness of capturing sunlight.
Final Design
This is the final design. Its facing north with sun path consideration, to allow as much as possible sunlight, but avoid the heat coming. Placed under the bridge to avoid the direct sunlight which increase the temperature inside.
Design development
Trying to find the design which is inspired by the cliff at the site, HSW, and turtle (protection).
Then I try to fits and maximalize the usage of rooms inside with my plan.
Then I try to fits and maximalize the usage of rooms inside with my plan.
Thursday, 28 April 2011
Subscribe to:
Posts (Atom)












